Want to know:
"_________________ must be made after the roof, framing, fireblocking, firestopping, draftstopping and bracing is in place and all sanitary, storm and water distribution piping is roughed-in, and prior to the installation of wall or ceiling membranes. A. Underground inspection B. Rough-in inspection C. Final D. none of these!"